FACILITIES
Terminal Facilities On Site
Rubb I 32,000sf
- above grade concrete floor
- filtered air
- three rail doors
- two truck doors
- food/paper grade
Rubb II 21,000sf
- above grade asphalt floor
- rail accessible
- one truck door
- filtered air
- food grade
Rubb III 10,000sf
- concrete deck only
- one truck door
- transit grade
Rubb IV 17,000sf
- above grade concrete floor
- filtered air
- one truck door
- paper grade
Rubb V 21,500sf
- above grade concrete floor
- filtered air
- two truck doors
- paper grade
Rubb VI 58,000sf
(under construction)
- above grade concrete floor
- heated humidity controlled
- three truck doors
- food/paper grade
Bulk Shed 23,500sf
- concrete floor
- transit grade
Total: 180,000sf of
covered cargo space
Maintenance Shop
Office and crew facilities
4 10-car rail sidings
1 60, 60-ton truck scale
3 bulk storage pads, asphalt paved 2ac, 2 ac, 1/4 ac
|
 |
 |
Terminal Facilities -- Off Site,
3 miles
| Building 4 |
21,000sf |
above grade concrete floor, four truck doors, six car rail siding,
paper grade |
| Building 5 |
54,000sf |
above grade concrete floor, temperature and humidity controlled,
six truck doors, four rail car doors, paper grade |
| Building 6 |
30,000sf |
above grade concrete floor, four truck doors, paper grade |
 |
105,000sf |
|